AUTOMATIC Feed Metalworking Cutting Hem Horizontal Band Saw
Band sawing machine with electro-mechanical blade tension
V-belt and Gear driven for optional
quick clamps rotated from 0-45
Band sawing machine with maximum processing capability of BAND SAW BS-712N is 7"(178mm)
2. The belt gear of it has four cutting speeds
3. The quick clamps can be rotated from 0° to 45°4. Can be used both vertically and horizontally
5. High-capacity due to controlled by motor
6. The falling speed of saw bow is controlled by hydraulic cylinder. The base of the roller can be move freely.
7. Has a sizing device (the machine will automatically stop after sawing materials)
8. With power break protection device, machine will power off automatically when the rear protective cover is opened
7. With cooling system, can prolong the service life of saw blade and improve the precision of work piece
9. Is equipped with a block feeder (with fixed sawing length)
10. Main technical parameter
View More
Spec/Model |
SK4232 |
GZ4235 |
GZ4240 |
GZ4250 |
GZ4265 |
Max capacity(mm) |
Round:300
Square:320*300 |
Round:350
Square:350*350 |
Round:400
Square:400*400 |
Round:500
Square:500*500 |
Round:650
Square:650*650 |
Blade speed
(m/min) |
29/54/68 |
22/45/68 |
25/53/76 |
22/40/70 |
22/40/60 |
Blade(mm) |
34*1.1*4115 |
34*1.1*4450 |
41*1.3*4900 |
41*1.3*5750 |
41*1.3*7000 |
Motor(kw) |
3 |
4 |
4 |
5.5 |
5.5 |
Oil pump(kw) |
0.75 |
1.5 |
1.5 |
1.5 |
1.5 |
Coolant(kw) |
0.04 |
0.04 |
0.04 |
0.04 |
0.04 |
Clamping |
Hydraulic |
Hydraulic |
Hydraulic |
Hydraulic |
Hydraulic |
Blade tension |
Manual |
Manual |
Manual |
Manual |
Manual |
Our Service
Installation:
The seller shall send one engineer to the buyer's country for installation, commissioning and training. The buyer is responsible to provide all necessary equipments for handling and lifting the machine parts before seller's engineers go to the buyer's plant. In addition, the buyer should provide workers to support in installation activities, under supervision from the seller's engineers.
Commission:
The Supplier should give drawings and other details of material/preparation required for installation of machinery which the buyer has to prepare and keep ready before the machine arrives at the buyer's factory. Installation and commissioning can be finished within 10-15 days for above machine generally.
Training:
Training will include training on computer programming, machine operation and troubleshooting. The training time is at most 5 days for this machine.
The buyer should arrange no less than two people for accepting training. After training, the buyer should sign the "Receiving & Inspection Report" supplied by the seller to demonstrate the successful finish of commissioning and acceptance of the buyer.
Usage
Delivery And Shipment
Warranty:
What about the spare part if the machine break down?
==about the machine break down, normally our policy will be as the under way
1) Our quality guarantee time is 12 months since the machine on board
2) During this period, if the machine break down owing our machine itself quality problem, we will prepare the spare parts and send to you by free within 5 days. all these will be by free.
3) If the break down is caused by the mis operation, we of course will supply you the spare parts, but we have to charge you the costs prices.